One of the largest concrete dams currently in the commissioning process in Spain relies on ORBINOX for a challenging flood control solution
All dams have a spillway at the crest that act as a safety limit in case of maximum filling of the reservoir. Sometimes the maximum level needs to be variable and is normally controlled by opening or closing the spillway gates. However, the variable level is limited by the height of the gates.
What if a much larger variation of the level of the reservoir is needed?